I have received a quote with a rate per cubic meter, based on an estimated volume. What happens if the actual volume appears to be more or less?

In case you received a quotation per m3 (or per 100 lbs.), the final volume should never be off more than 10% from the estimated quantity. Should the final volume (after loading) show a larger deviation, the mover will make a comparison between estimation and packing lists.